Journal: Sensors (Basel, Switzerland)
Article Title: A Preliminary Contribution towards a Risk-Based Model for Flood Management Planning Using BIM: A Case Study of Lisbon
doi: 10.3390/s22197456
Figure Lengend Snippet: Scope of the research area. A CAD file with the altimetry of the city of Lisbon was scrubbed of the unneeded layers, purged and linked to the BIM file, and subsequently used for the automatic generation of the toposurface. ( a ) The 3D terrain modelled in Autodesk Revit in all its extension. ( b ) Curves and point observations taken from the cartography 1:1000. ( c ) Satellite view of the research area in which are highlighted some important spots as visual reference in the Lisbon council.
Article Snippet: We used the 2020 version of Autodesk Revit software to explore the application of BIM for Urban Planning.
Techniques: